Manufacturing

BOM- Bill of Material (in fact covers full BOR – Bill of Resources – material plus other inputs like power consumption), DCN – Design Change Notice, Production Plan, Production and material control, MRP for Production Plan.

Features:

  • BOM covers Yield/Rejection, Cost Effect – thus this is a good product configuration.
  • Drawing and Data will move together.
  • Design Change Notice to track/authorize changes in BOM.
  • Production report: used for Material Control on shop floor.
  • Comprehensive on- line drill down on data entry/query forms.
  • Various reports as part of standard package.

Scope and facilities:

BOM Production Plan(Scheduler) Work order
Material requirement Plan ( MRP ) Production Recording Cost of batch working
Joint Products, By Products, Scrap Recovery Comparison: Standard Cost Vs. Actual Cost