BOM- Bill of Material (in fact covers full BOR – Bill of Resources – material plus other inputs like power consumption), DCN – Design Change Notice, Production Plan, Production and material control, MRP for Production Plan.
Features:
- BOM covers Yield/Rejection, Cost Effect – thus this is a good product configuration.
- Drawing and Data will move together.
- Design Change Notice to track/authorize changes in BOM.
- Production report: used for Material Control on shop floor.
- Comprehensive on- line drill down on data entry/query forms.
- Various reports as part of standard package.
Scope and facilities:
BOM | Production Plan(Scheduler) | Work order |
Material requirement Plan ( MRP ) | Production Recording | Cost of batch working |
Joint Products, By Products, Scrap Recovery | Comparison: Standard Cost Vs. Actual Cost |